APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: April 2004

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

06/04/2004

71

67

80

76

18.5

100

86

12/04/2004

29

27

29

32

7.6

230

80

18/04/2004

(2)

82

59

63

15.9

280

72

20/04/2004

61

-

-

-

6.1

120

79

24/04/2004

85

80

76

69

35.5

100

85

30/04/2004

(2)

46

55

54

12.3

070

86

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

06/04/2004

15:00-15:59

87

81

87

16:00-16:59

81

74

86

17:00-17:59

80

75

85

12/04/2004

15:00-15:59

24

28

30

16:00-16:59

30

42

33

17:00-17:59

32

30

30

18/04/2004

15:00-15:59

110

144

108

16:00-16:59

108

133

108

17:00-17:59

126

167

109

24/04/2004

15:00-15:59

69

69

76

16:00-16:59

65

65

74

17:00-17:59

74

70

78

30/04/2004

15:00-15:59

55

71

44

16:00-16:59

63

54

57

17:00-17:59

73

62

61

 

Remark:

(1)            The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)            High Volume Air Sampler at AM1 was found defective during the collection of filter paper on 19/4/2004 and 3/5/2004.  The defect was rectified on the same day.  A make-up 24 hr TSP sampling for AM1 was performed on 20/4/2004 and 4/5/2004 respectively.

 

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler