APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: April 2004
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From Hong Kong Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
06/04/2004 |
71 |
67 |
80 |
76 |
18.5 |
100 |
86 |
12/04/2004 |
29 |
27 |
29 |
32 |
7.6 |
230 |
80 |
18/04/2004 |
(2) |
82 |
59 |
63 |
15.9 |
280 |
72 |
20/04/2004 |
61 |
- |
- |
- |
6.1 |
120 |
79 |
24/04/2004 |
85 |
80 |
76 |
69 |
35.5 |
100 |
85 |
30/04/2004 |
(2) |
46 |
55 |
54 |
12.3 |
070 |
86 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
06/04/2004 |
15:00-15:59 |
87 |
81 |
87 |
16:00-16:59 |
81 |
74 |
86 |
|
17:00-17:59 |
80 |
75 |
85 |
|
12/04/2004 |
15:00-15:59 |
24 |
28 |
30 |
16:00-16:59 |
30 |
42 |
33 |
|
17:00-17:59 |
32 |
30 |
30 |
|
18/04/2004 |
15:00-15:59 |
110 |
144 |
108 |
16:00-16:59 |
108 |
133 |
108 |
|
17:00-17:59 |
126 |
167 |
109 |
|
24/04/2004 |
15:00-15:59 |
69 |
69 |
76 |
16:00-16:59 |
65 |
65 |
74 |
|
17:00-17:59 |
74 |
70 |
78 |
|
30/04/2004 |
15:00-15:59 |
55 |
71 |
44 |
16:00-16:59 |
63 |
54 |
57 |
|
17:00-17:59 |
73 |
62 |
61 |
Remark:
(1)
The monitoring stations, Reservoir, East Gate
& Ash Lagoon are located within Lamma Power Station.
(2)
High
Volume Air
Sampler at AM1 was found defective during the
collection of filter paper on 19/4/2004 and 3/5/2004. The defect
was rectified on the same day. A make-up 24 hr TSP sampling for AM1 was performed on 20/4/2004 and 4/5/2004 respectively.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
Tai Yuen Village |
- |
MINIVOL Portable Sampler |