APPENDIX D  AIR QUALITY MONITORING RESULTS
 
Site: Lamma Power
Station Extension
 
Month: May 2004
 
24 hour TSP
Measurement:-
| Date | TSP concentration (mg/m3) | Weather Information (From Hong Kong Observatory) | |||||
| Reservoir   (AM1) | East Gate (AM2) | Ash Lagoon   (AM3) | Tai Yuen Village (AM4) | Mean Wind Speed (km/hr) | Prevailing Wind Dir. (°) | Mean R.H.   (%) | |
| 04/05/2004 | 98(2) | - | - | - | 14.1 | 020 | 83 | 
| 06/05/2004 | 52  | 48  | 49  | 47  | 21.3 | 090 | 82 | 
| 12/05/2004 | 24  | 21  | 17  | 19  | 10.7 | 190 | 81 | 
| 18/05/2004 | 58  | 53  | 57  | 67  | 13.9 | 060 | 82 | 
| 24/05/2004 | 58  | 53  | 51  | 49  | 26.0 | 090 | 73 | 
| 30/05/2004 | 23  | 38  | 16  | 19  | 14.4 | 180 | 81 | 
 
1 hour TSP Measurement:-
| Date | Time | TSP concentration (mg/m3) | ||
| Reservoir (AM1) | East Gate (AM2) | Ash Lagoon (AM3) | ||
| 06/05/2004 | 15:00-15:59 | 55 | 56 | 57 | 
| 16:00-16:59 | 46 | 43 | 48 | |
| 17:00-17:59 | 40 | 41 | 42 | |
| 12/05/2004 | 15:00-15:59 | 20 | 92 | 8 | 
| 16:00-16:59 | 13 | 13 | 5 | |
| 17:00-17:59 | 17 | 17 | 11 | |
| 18/05/2004 | 15:00-15:59 | 64 | 60 | 61 | 
| 16:00-16:59 | 64 | 61 | 61 | |
| 17:00-17:59 | 60 | 53 | 56 | |
| 24/05/2004 | 15:00-15:59 | 87 | 70 | 84 | 
| 16:00-16:59 | 69 | 60 | 68 | |
| 17:00-17:59 | 71 | 66 | 66 | |
| 30/05/2004 | 15:00-15:59 | 18 | 20 | 22 | 
| 16:00-16:59 | 24 | 20 | 26 | |
| 17:00-17:59 | 19 | 22 | 20 | |
 
Remark:
(1)           
The monitoring stations, Reservoir, East Gate
& Ash Lagoon are located within Lamma Power Station.
(2)        Make
up sampling for the dust sampling at Reservoir Area originally scheduled on
30/4/2004 due to the malfunction of HVAS.
                                                                        1-hr
TSP                24-hr
TSP
                                                                          (mg/m3)                   (mg/m3)
Action Level                                                      340                          190
Limit Level                                                          500                          260
 
 
Calibration:            Calibration
details are shown in appendix F.
 
Equipment used:
| Location | 1-hr TSP | 24-hr TSP | 
| Reservoir and East Gate | TEOM 1400a | High Volume Air Sampler | 
| Ash Lagoon | Partisol Model 2000 Sampler | |
| Tai Yuen Village | - | MINIVOL Portable Sampler | 

 

 
 
 
 

 