APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: June 2004

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

05/06/2004

-

37

37

-

24.7

100

80

08/06/2004

-

-

-

53

11.3

020

78

09/06/2004

72

-

-

-

9.6

160

77

11/06/2004

59

45

68

74

34.8

090

70

17/06/2004

29

31

25

18

12.0

170

80

23/06/2004

60

55

45

47

29.9

200

81

29/06/2004

79

95

69

65

20.3

280

72

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

05/06/2004

15:00-15:59

44

43

52

16:00-16:59

37

37

43

17:00-17:59

31

35

43

11/06/2004

15:00-15:59

65

63

64

16:00-16:59

81

85

90

17:00-17:59

79

73

80

17/06/2004

15:00-15:59

13

32

16

16:00-16:59

26

29

24

17:00-17:59

16

27

19

23/06/2004

15:00-15:59

37

59

24

16:00-16:59

76

82

59

17:00-17:59

35

55

32

29/06/2004

15:00-15:59

69

99

88

16:00-16:59

181

172

157

17:00-17:59

122

126

105

 

Remark:

(1)            The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)            HVAS at AM1 was found defective during collection of filter sample on 7/6/2004.  Defect was rectified on 8/6/2004.  A make-up 24 hours TSP sampling at AM1 was conducted on 9/6/2004.

(3)            MiniVol at AM4 was found defective during collection of filter sample on 7/6/2004.  Defect was rectified on the same day.  A make-up 24 hours TSP sampling at AM1 was conducted on 8/6/2004.

 

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

 

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler