APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: July 2004

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

05/07/2004

48

47

38

44

28.7

230

78

11/07/2004

(3)

53

27

25

28.5

210

77

13/07/2004

27

-

-

-

11.2

230

80

17/07/2004

20

32

22

6

17.2

160

92

23/07/2004

26

31

25

19

21.8

70

82

29/07/2004

17

28

19

24

18.2

110

96

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

05/07/2004(2)

15:00-15:59

34 (7/7)

47

39

16:00-16:59

39 (7/7)

43

39

17:00-17:59

41 (7/7)

55

41

11/07/2004(3)

15:00-15:59

28 (12/7)

38

17

16:00-16:59

23 (12/7)

45

28

17:00-17:59

18 (12/7)

90

62

17/07/2004

15:00-15:59

28

28

33

16:00-16:59

20

30

30

17:00-17:59

11

13

15

23/07/2004

15:00-15:59

13

20

18

16:00-16:59

21

24

30

17:00-17:59

37

31

36

29/07/2004

15:00-15:59

7

12

12

16:00-16:59

16

17

12

17:00-17:59

11

16

14

 

Remark:

(1)            The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)            TEOM 1-hr TSP sampler at AM1 (Reservoir) defected on 05/07/2004.  A make-up 1hr TSP sampling for AM1 was carried out on 07/07/2004.

(3)            Both 1-hr & 24-hr TSP sampling at AM1 (Reservoir) were suspended due to the failure of power supply.  Make-up sampling for 1-hr & 24-hr TSP sampling at AM1 was conducted on 12/07/2004 and 13/07/2004 respectively.                                                                                                            

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

 

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler