APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: May 2005

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

01/05/2005

31

27

24

36

23.9

200

82

07/05/2005

53

51

50

74

20.0

080

77

13/05/2005

41

51

26

39

22.0

220

81

19/05/2005

24

42

24

24

19.5

090

92

25/05/2005

(2)

42

27

29

22.8

090

87

27/05/2005

32

-

-

-

14.0

110

92

31/05/2005

28

36

24

35

16.0

080

83

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

01/05/2005

15:00-15:59

30

29

29

16:00-16:59

30

34

27

17:00-17:59

28

28

26

07/05/2005

15:00-15:59

61

52

63

16:00-16:59

61

55

60

17:00-17:59

63

61

65

13/05/2005

15:00-15:59

39

302

36

16:00-16:59

43

46

32

17:00-17:59

47

164

34

19/05/2005

15:00-15:59

8

34

12

16:00-16:59

12

58

14

17:00-17:59

15

45

15

25/05/2005

15:00-15:59

24

41

30

16:00-16:59

30

39

32

17:00-17:59

28

33

35

31/05/2005

15:00-15:59

20

24

18

16:00-16:59

23

22

22

17:00-17:59

24

26

27

 

Remark:

(1)            The monitoring stations, Reservoir, East Gate & Ash Lagoon are located within Lamma Power Station.

(2)            HVAS 24-hr TSP sampler at AM1 (Reservoir) was found defective on 26/05/2005, during the collection of filter sample.  Defect was rectified on the same day.  A make-up 24-hr TSP sampling for AM1 was carried out on 27/05/2005.                                                                                                                                         

 

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler