Appendix A – Construction Phase Mitigation Measures
and their Implementation (Gas
Pipeline)
| 
    EP-071/2000/C   | 
   
    EM&A Log Ref.  | 
   
    Mitigation
   Measures  | 
   
    Implemen-tation Status  | 
  
| 
   | 
  
   | 
  
   Air Quality   | 
  
   | 
 
| 
   | 
  
   Q1  | 
  
   For the fuel gas
  supply system, equipment shall be chosen and measures taken, so as to prevent
  CH4 leakage from the system. In accordance with this
  recommendation, HEC shall be implementing the following:   | 
  
   | 
 
| 
   ·         
  corrosion-preventing
  coatings on the pipeline;  | 
  
   C  | 
 ||
| 
   ·         
  welded
  pipe joints; and  | 
  
   C  | 
 ||
| 
   ·         
  laying
  of pipeline below sea bed such that it is well protected from potential
  damages by marine activities.  | 
  
   C  | 
 ||
| 
   | 
  
   Q2  | 
  
   HEC shall submit to
  EPD for review, a report of the above actions.   | 
  
   C  | 
 
| 
   | 
  
   | 
  
   Water Quality   | 
  
   | 
 
| 
   3.8  | 
  
   R1  | 
  
   The following rates of
  dredging for the trenches at the Shenzhen and Lamma approaches and the rate
  of progress of the jetting shall be adopted:  | 
  
   | 
 
| 
   ·         
  a single small grab
  dredger with a maximum daily rate of working of 2,400m3  | 
  
   NA  | 
 ||
| 
   ·         
  maximum
  forward speed of the jetting machine shall be 7 m per minute  | 
  
   NA  | 
 ||
| 
   | 
  
   R2  | 
  
   No further mitigation
  measures were considered necessary, however if unacceptable impacts were to
  be found in the course of the EM&A programme for the pipeline jetting,
  then the following measures shall be implemented:  | 
  
   | 
 
| 
   ·         
  reducing the speed of the water jetting machine; and  | 
  
   NA  | 
 ||
| 
   ·         
  temporary suspension of
  the works.  | 
  
   NA  | 
 ||
| 
   3.10  | 
  
   | 
  
   Pipeline jetting shall
  only be carried out in the open sea which is far away from sensitive
  receivers as recommended in the application document for variation of an
  environmental permit (the Application VEP-174/2005) and indicated in the Figure C1 at the Appendix C of the Permit
  during the initial jetting operation. Water quality monitoring shall be
  conducted during the pipeline jetting.  | 
  
   NA  | 
 
| 
   | 
  
   | 
  
   MARINE
  ECOLOGICAL IMPACTS  | 
  
   | 
 
| 
   3.9  | 
  
   S1  | 
  
   To avoid disruption to
  the Neophocaena phocaenoides (finless porpoise) population in the
  southwestern coastal waters of   | 
  
   C  | 
 
| 
   | 
  
   | 
  
   hAZARDS  | 
  
   | 
 
| 
   | 
  
   T1  | 
  
   Detail
  quantitative risk study shall be conducted in accordance with the
  requirements in the Gas Safety Ordinance (Cap.51) to satisfy EMSD’s
  requirements which shall ensure adequate design of the pipeline to protect
  against third party damage and safe operation of the pipeline system.  | 
  
   C  | 
 
| 
   | 
  
   T2  | 
  
   HEC shall review
  their existing safety management system against current best practice.  | 
  
   C  | 
 
Remarks:
C          -           Compliance with mitigation measure
NC        -           Non-compliance with mitigation
measure
N/A       -           Not Applicable