APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: June 2005

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

06/06/2005

58

59

49

60

39.0

080

82

12/06/2005

31

47

*

32

23.1

240

80

15/06/2005

-

-

31

-

20.2

250

92

18/06/2005

49

38

22

35

33.0

220

82

24/06/2005

30

36

27

36

17.9

200

93

30/06/2005

15

21

13

18

32.3

170

91

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

06/06/2005

15:00-15:59

67

66

70

16:00-16:59

58

61

60

17:00-17:59

56

53

57

12/06/2005

15:00-15:59

28

33

25

16:00-16:59

35

46

28

17:00-17:59

36

70

33

18/06/2005

15:00-15:59

50

36

20

16:00-16:59

57

37

21

17:00-17:59

111

34

21

24/06/2005

15:00-15:59

#

15

17

16:00-16:59

#

40

24

17:00-17:59

#

37

34

26/06/2005

15:00-15:59

21

-

-

16:00-16:59

13

-

-

17:00-17:59

25

-

-

30/06/2005

15:00-15:59

12

18

14

16:00-16:59

14

17

17

17:00-17:59

9

13

13

 

Remark:

*    -     24-hr Partisol TSP sampler at AM3 (Ash Lagoon) was found defective on 13/06/2005, during the collection of filter sample.  MiniVol TSP sampler was used to conduct the 24-hr TSP make-up sampling on 15/06/2005.  A new Partisol TSP sampler was installed on 17/06/2005 to replace the defective sampler.

 

#    -    Missing data was due to power failure of 1-hr TEOM TSP sampler at AM1 (Reservoir) on 24/06/2005.  Make-up 1-hr TSP sampling was conducted on 26/06/2005.                                                                                                                                                     

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

 

Calibration:            Calibration details are shown in appendix F.

 

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler