Appendix G – Construction Phase Mitigation Measures
and their Implementation (Gas
Pipeline)
EP-071/2000/C |
EM&A Log Ref. |
Mitigation
Measures |
Implemen-tation Status |
|
|
Air Quality |
|
|
Q1 |
For the fuel gas
supply system, equipment shall be chosen and measures taken, so as to prevent
CH4 leakage from the system. In accordance with this
recommendation, HEC shall be implementing the following: |
|
·
corrosion-preventing
coatings on the pipeline; |
C |
||
·
welded
pipe joints; and |
C |
||
·
laying
of pipeline below sea bed such that it is well protected from potential
damages by marine activities. |
C |
||
|
Q2 |
HEC shall submit to
EPD for review, a report of the above actions. |
C |
|
|
Water Quality |
|
3.8 |
R1 |
The following rates of
dredging for the trenches at the Shenzhen and Lamma approaches and the rate
of progress of the jetting shall be adopted: |
|
·
a single small grab
dredger with a maximum daily rate of working of 2,400m3 |
NA |
||
·
maximum
forward speed of the jetting machine shall be 7 m per minute |
C |
||
|
R2 |
No further mitigation
measures were considered necessary, however if unacceptable impacts were to
be found in the course of the EM&A programme for the pipeline jetting,
then the following measures shall be implemented: |
|
·
reducing the speed of the water jetting machine; and |
NA |
||
·
temporary suspension of
the works. |
NA |
||
3.10 |
|
Pipeline jetting shall
only be carried out in the open sea which is far away from sensitive
receivers as recommended in the application document for variation of an
environmental permit (the Application VEP-174/2005) and indicated in the Figure C1 at the Appendix C of the Permit
during the initial jetting operation. Water quality monitoring shall be
conducted during the pipeline jetting. |
C |
|
|
MARINE
ECOLOGICAL IMPACTS |
|
3.9 |
S1 |
To avoid disruption to
the Neophocaena phocaenoides (finless porpoise) population in the
southwestern coastal waters of |
C |
|
|
hAZARDS |
|
|
T1 |
Detail
quantitative risk study shall be conducted in accordance with the
requirements in the Gas Safety Ordinance (Cap.51) to satisfy EMSD’s
requirements which shall ensure adequate design of the pipeline to protect
against third party damage and safe operation of the pipeline system. |
C |
|
T2 |
HEC shall review
their existing safety management system against current best practice. |
C |
Remarks:
C - Compliance with mitigation measure
NC - Non-compliance with mitigation
measure
N/A - Not Applicable