APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: August 2005

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

05/08/2005

43

75

37

43

25.8

260

78

11/08/2005

31

43

31

31

26.2

100

86

17/08/2005

17

28

18

24

20.0

110

96

23/08/2005

40

37

86

39

15.6

230

80

29/08/2005

21

*

20

33

22.6

100

89

31/08/2005

-

65

-

-

18.1

270

76

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

05/08/2005

15:00-15:59

34

49

37

16:00-16:59

64

122

71

17:00-17:59

57

138

59

11/08/2005

15:00-15:59

29

32

25

16:00-16:59

32

34

56

17:00-17:59

33

35

40

17/08/2005

15:00-15:59

4

20

6

16:00-16:59

9

15

4

17:00-17:59

15

18

19

23/08/2005

15:00-15:59

31

36

27

16:00-16:59

35

34

22

17:00-17:59

37

21

21

29/08/2005

15:00-15:59

21

47

19

16:00-16:59

18

28

15

17:00-17:59

14

17

16

 

* - 24-hr Partisol TSP sampler at AM2 (East Gate) was found defective on 30/08/2005, during the collection of filter sample.  Defect was rectified on the same day.  A 24-hr TSP make-up sampling was conducted on 31/08/2005.                                                                                                                                                                                                      

 

                                                                        1-hr TSP                24-hr TSP

                                                                          (mg/m3)                   (mg/m3)

Action Level                                                      340                          190

Limit Level                                                          500                          260

 

Calibration:            Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM 1400a

High Volume Air Sampler

Ash Lagoon

Partisol Model 2000 Sampler

Tai Yuen Village

-

MINIVOL Portable Sampler