APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: December 2005
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From Hong Kong Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
03/12/2005 |
82 |
78 |
81 |
103 |
24.7 |
070 |
76 |
09/12/2005 |
79 |
76 |
76 |
103 |
29.9 |
070 |
78 |
15/12/2005 |
143 |
134 |
120 |
114 |
34.0 |
020 |
39 |
21/12/2005* |
230 |
244 |
258 |
196 |
51.6 |
020 |
37 |
27/12/2005 |
115 |
108 |
160 |
126 |
36.3 |
070 |
75 |
29/12/2005 |
74 |
70 |
57 |
61 |
20.8 |
040 |
83 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
03/12/2005 |
15:00-15:59 |
70 |
68 |
61 |
16:00-16:59 |
70 |
68 |
65 |
|
17:00-17:59 |
83 |
94 |
91 |
|
09/12/2005 |
15:00-15:59 |
88 |
89 |
89 |
16:00-16:59 |
74 |
80 |
72 |
|
17:00-17:59 |
77 |
82 |
75 |
|
15/12/2005 |
15:00-15:59 |
74 |
93 |
77 |
16:00-16:59 |
80 |
82 |
94 |
|
17:00-17:59 |
104 |
124 |
120 |
|
21/12/2005 |
15:00-15:59 |
208 |
207 |
209 |
16:00-16:59 |
269 |
236 |
249 |
|
17:00-17:59 |
253 |
194 |
242 |
|
27/12/2005 |
15:00-15:59 |
91 |
106 |
92 |
16:00-16:59 |
125 |
113 |
106 |
|
17:00-17:59 |
129 |
116 |
107 |
* Action Level
exceedances were recorded at all air quality monitoring stations. After investigation, it was found that
the RSP concentrations recorded by all EPD monitoring stations on 21 December
2005 were very high. This
suggested that the background dust concentration levels had already been high. As no significant dusty activity was
carried out in Lamma Extension construction site on that day, it is considered
that all the action level exceedances were not related to the site
activities. Hence no further
action is required. Subsequent
repeated samplings were conducted on 29/12/2005 as required.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
Tai Yuen Village |
- |
MINIVOL Portable Sampler |