APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: March 2006
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From Hong Kong Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
03/03/2006 |
60 |
54 |
63 |
63 |
23.6 |
070 |
74 |
09/03/2006 |
94 |
68 |
74 |
85 |
8.3 |
030 |
87 |
15/03/2006 |
* |
57 |
67 |
81 |
23.4 |
050 |
82 |
17/03/2006 |
82 |
- |
- |
- |
18.3 |
030 |
91 |
21/03/2006 |
124 |
111 |
124 |
143 |
17.3 |
040 |
91 |
27/03/2006 |
50 |
42 |
41 |
54 |
21.5 |
040 |
96 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
03/03/2006 |
15:00-15:59 |
53 |
57 |
43 |
16:00-16:59 |
59 |
62 |
53 |
|
17:00-17:59 |
41 |
37 |
54 |
|
09/03/2006 |
15:00-15:59 |
76 |
78 |
56 |
16:00-16:59 |
96 |
83 |
58 |
|
17:00-17:59 |
113 |
91 |
66 |
|
15/03/2006 |
15:00-15:59 |
62 |
71 |
60 |
16:00-16:59 |
60 |
69 |
61 |
|
17:00-17:59 |
72 |
77 |
68 |
|
21/03/2006 |
15:00-15:59 |
117 |
120 |
120 |
16:00-16:59 |
142 |
144 |
146 |
|
17:00-17:59 |
161 |
152 |
165 |
|
27/03/2006 |
15:00-15:59 |
31 |
43 |
33 |
16:00-16:59 |
46 |
51 |
46 |
|
17:00-17:59 |
64 |
59 |
57 |
* - 24-hr TSP sampler at AM1 (Reservoir) was found defective on 16/03/2006, during the collection of filter sample. Defect was rectified on the same day. A 24-hr TSP make-up sampling was conducted on 17/03/2006.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
Tai Yuen Village |
- |
MINIVOL Portable Sampler |