APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: May 2006
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
(AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
02/05/2006 |
30 |
30 |
27 |
32 |
24.8 |
240 |
86 |
08/05/2006 |
25 |
29 |
20 |
26 |
15.1 |
190 |
79 |
14/05/2006 |
86 |
66 |
62 |
61 |
29.2 |
010 |
69 |
20/05/2006 |
41 |
35 |
41 |
74 |
27.3 |
080 |
85 |
26/05/2006 |
25 |
30 |
18 |
22 |
22.3 |
230 |
80 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
02/05/2006 |
15:00-15:59 |
28 |
40 |
* |
16:00-16:59 |
29 |
32 |
* |
|
17:00-17:59 |
35 |
38 |
* |
|
03/05/2006 |
15:00-15:59 |
- |
- |
5 |
16:00-16:59 |
- |
- |
16 |
|
17:00-17:59 |
- |
- |
14 |
|
08/05/2006 |
15:00-15:59 |
30 |
36 |
12 |
16:00-16:59 |
18 |
27 |
13 |
|
17:00-17:59 |
13 |
17 |
11 |
|
14/05/2006 |
15:00-15:59 |
44 |
53 |
44 |
16:00-16:59 |
52 |
58 |
50 |
|
17:00-17:59 |
37 |
47 |
38 |
|
20/05/2006 |
15:00-15:59 |
41 |
39 |
37 |
16:00-16:59 |
41 |
41 |
40 |
|
17:00-17:59 |
44 |
43 |
42 |
|
26/05/2006 |
15:00-15:59 |
20 |
38 |
16 |
16:00-16:59 |
18 |
38 |
20 |
|
17:00-17:59 |
22 |
39 |
21 |
* - Missing data was due to
failure of 1-hr TEOM TSP sampler at AM3 (Ash Lagoon) on 02/05/2006. Make-up 1-hr TSP sampling was conducted on
03/05/2006.
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
|
- |
MINIVOL Portable Sampler |