APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: June 2006
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
(AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
01/06/2006 |
23 |
24 |
21 |
43 |
26.6 |
230 |
88 |
07/06/2006 |
60 |
45 |
36 |
47 |
34.0 |
230 |
81 |
13/06/2006 |
36 |
28 |
34 |
38 |
18.7 |
200 |
89 |
19/06/2006 |
33 |
32 |
36 |
31 |
10.3 |
050 |
86 |
25/06/2006 |
32 |
14 |
17 |
26 |
10.8 |
200 |
77 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
01/06/2006 |
15:00-15:59 |
14 |
21 |
17 |
16:00-16:59 |
25 |
25 |
22 |
|
17:00-17:59 |
23 |
26 |
28 |
|
07/06/2006 |
15:00-15:59 |
44 |
89 |
33 |
16:00-16:59 |
48 |
60 |
31 |
|
17:00-17:59 |
52 |
51 |
35 |
|
13/06/2006 |
15:00-15:59 |
23 |
26 |
24 |
16:00-16:59 |
23 |
29 |
24 |
|
17:00-17:59 |
25 |
30 |
28 |
|
19/06/2006 |
15:00-15:59 |
17 |
39 |
11 |
16:00-16:59 |
18 |
24 |
21 |
|
17:00-17:59 |
28 |
40 |
26 |
|
25/06/2006 |
15:00-15:59 |
36 |
25 |
13 |
16:00-16:59 |
26 |
10 |
8 |
|
17:00-17:59 |
18 |
4 |
6 |
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
|
- |
MINIVOL Portable Sampler |