Appendix A – Construction Phase Mitigation
Measures and their Implementation (Gas Pipeline)
| 
    EP-071/2000/C
     | 
   
    EM&A
   Log Ref.  | 
   
    Mitigation
   Measures  | 
   
    Implemen-tation
   Status  | 
  
| 
   | 
  
   | 
  
   Air Quality   | 
  
   | 
 
| 
   | 
  
   Q1  | 
  
   For the
  fuel gas supply system, equipment shall be chosen and measures taken, so as
  to prevent CH4 leakage from the system. In accordance with this
  recommendation, HEC shall be implementing the following:   | 
  
   | 
 
| 
   ·         
  corrosion-preventing coatings on the pipeline;  | 
  
   C  | 
 ||
| 
   ·         
  welded pipe joints; and  | 
  
   C  | 
 ||
| 
   ·         
  laying of pipeline below sea bed such that it is well protected from
  potential damages by marine activities.  | 
  
   C  | 
 ||
| 
   | 
  
   Q2  | 
  
   HEC shall
  submit to EPD for review, a report of the above actions.   | 
  
   C  | 
 
| 
   | 
  
   | 
  
   Water Quality   | 
  
   | 
 
| 
   3.8  | 
  
   R1  | 
  
   The
  following rates of dredging for the trenches at the Shenzhen and Lamma approaches
  and the rate of progress of the jetting shall be adopted:  | 
  
   | 
 
| 
   ·         
  a single small grab dredger with a maximum daily rate of working of
  2,400m3  | 
  
   NA  | 
 ||
| 
   ·         
  maximum forward speed of the jetting machine shall be 7 m per minute  | 
  
   NA  | 
 ||
| 
   | 
  
   R2  | 
  
   No further
  mitigation measures were considered necessary, however if unacceptable
  impacts were to be found in the course of the EM&A programme for the
  pipeline jetting, then the following measures shall be implemented:  | 
  
   | 
 
| 
   ·         
  reducing the speed of the water jetting machine;
  and  | 
  
   NA  | 
 ||
| 
   ·         
  temporary suspension of the works.  | 
  
   NA  | 
 ||
| 
   3.10  | 
  
   | 
  
   Pipeline
  jetting shall only be carried out in the open sea which is far away from
  sensitive receivers as recommended in the application document for variation
  of an environmental permit (the Application VEP-174/2005) and indicated in
  the Figure C1 at the Appendix C of the Permit
  during the initial jetting operation. Water quality monitoring shall be
  conducted during the pipeline jetting.  | 
  
   NA  | 
 
| 
   | 
  
   | 
  
   MARINE
  ECOLOGICAL IMPACTS  | 
  
   | 
 
| 
   3.9  | 
  
   S1  | 
  
   To avoid
  disruption to the Neophocaena phocaenoides (finless porpoise)
  population in the southwestern coastal waters of   | 
  
   C  | 
 
| 
   | 
  
   | 
  
   hAZARDS  | 
  
   | 
 
| 
   | 
  
   T1  | 
  
   Detail
  quantitative risk study shall be conducted in accordance with the
  requirements in the Gas Safety Ordinance (Cap.51) to satisfy EMSD’s
  requirements which shall ensure adequate design of the pipeline to protect
  against third party damage and safe operation of the pipeline system.  | 
  
   C  | 
 
| 
   | 
  
   T2  | 
  
   HEC shall review
  their existing safety management system against current best practice.  | 
  
   C  | 
 
Remarks:
C          -           Compliance
with mitigation measure
NC        -           Non-compliance
with mitigation measure
N/A       -           Not
Applicable