APPENDIX D AIR QUALITY MONITORING RESULTS
Site: Lamma Power
Station Extension
Month: August 2006
24 hour TSP
Measurement:-
Date |
TSP concentration (mg/m3) |
Weather Information (From |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
(AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind Dir. (°) |
Mean R.H. (%) |
|
06/08/2006 |
27 |
28 |
44 |
22 |
16.7 |
100 |
91 |
12/08/2006 |
25 |
25 |
33 |
44 |
20.7 |
100 |
84 |
18/08/2006 |
32 |
41 |
39 |
35 |
21.8 |
260 |
78 |
24/08/2006 |
22 |
26 |
24 |
25 |
21.2 |
110 |
92 |
30/08/2006 |
22 |
26 |
26 |
24 |
17.2 |
240 |
77 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration (mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
06/08/2006 |
15:00-15:59 |
18 |
21 |
23 |
16:00-16:59 |
13 |
19 |
17 |
|
17:00-17:59 |
20 |
26 |
20 |
|
12/08/2006 |
15:00-15:59 |
2 |
11 |
13 |
16:00-16:59 |
9 |
14 |
12 |
|
17:00-17:59 |
13 |
19 |
17 |
|
18/08/2006 |
15:00-15:59 |
41 |
52 |
43 |
16:00-16:59 |
53 |
82 |
61 |
|
17:00-17:59 |
29 |
54 |
35 |
|
24/08/2006 |
15:00-15:59 |
26 |
31 |
32 |
16:00-16:59 |
9 |
23 |
5 |
|
17:00-17:59 |
22 |
28 |
33 |
|
30/08/2006 |
15:00-15:59 |
15 |
28 |
8 |
16:00-16:59 |
17 |
21 |
16 |
|
17:00-17:59 |
23 |
23 |
15 |
1-hr
TSP 24-hr
TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration
details are shown in appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East Gate |
TEOM 1400a |
High Volume Air Sampler |
Ash Lagoon |
Partisol Model 2000 Sampler |
|
|
- |
MINIVOL Portable Sampler |