APPENDIX D AIR QUALITY
MONITORING RESULTS
Site: Lamma Power Station Extension
Month: July 2016
24 hour TSP
Measurement:-
Date |
TSP concentration
(mg/m3) |
Weather
Information (From Hong Kong
Observatory) |
|||||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
Tai Yuen Village (AM4) |
Mean Wind Speed (km/hr) |
Prevailing Wind
Dir. (°) |
Mean R.H. (%) |
|
02/07/2016 |
69 |
46 |
23 |
22 |
21.9 |
200 |
82 |
08/07/2016 |
86 |
87 |
69 |
67 |
23.5 |
280 |
75 |
14/07/2016 |
38 |
36 |
33 |
35 |
14.3 |
230 |
86 |
20/07/2016 |
46 |
28 |
22 |
39 |
22.7 |
220 |
82 |
26/07/2016 |
19 |
18 |
15 |
19 |
17.5 |
060 |
84 |
1 hour TSP Measurement:-
Date |
Time |
TSP concentration
(mg/m3) |
||
Reservoir (AM1) |
East Gate (AM2) |
Ash Lagoon (AM3) |
||
02/07/2016 |
15:00-15:59 |
22 |
0 |
7 |
16:00-16:59 |
0 |
21 |
19 |
|
17:00-17:59 |
47 |
84 |
37 |
|
08/07/2016 |
15:00-15:59 |
98 |
107 |
86 |
16:00-16:59 |
82 |
106 |
92 |
|
17:00-17:59 |
95 |
115 |
107 |
|
14/07/2016 |
15:00-15:59 |
52 |
55 |
33 |
16:00-16:59 |
47 |
77 |
39 |
|
17:00-17:59 |
37 |
51 |
46 |
|
20/07/2016 |
15:00-15:59 |
26 |
16 |
22 |
16:00-16:59 |
34 |
36 |
21 |
|
17:00-17:59 |
31 |
42 |
21 |
|
26/07/2016 |
15:00-15:59 |
52 |
40 |
23 |
16:00-16:59 |
14 |
7 |
9 |
|
17:00-17:59 |
12 |
16 |
15 |
1-hr
TSP 24-hr TSP
(mg/m3) (mg/m3)
Action Level 340 190
Limit Level 500 260
Calibration: Calibration details are shown in
appendix F.
Equipment used:
Location |
1-hr TSP |
24-hr TSP |
Reservoir and East
Gate |
TEOM |
High Volume Air
Sampler |
Ash Lagoon |
TEOM |
TEOM |
Tai Yuen Village |
- |
MINIVOL Portable
Sampler |