APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: October 2016

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

6/10/2016

48

47

38

42

***

***

75

12/10/2016

27

29

22

6

***

***

84

18/10/2016

15

25

17

13

***

***

96

24/10/2016

20

23

13

22

***

***

88

30/10/2016

61(2/11)

51

43 (29/10)*

61

***

***

74

***-  wind data not available from Hong Kong Observatory

# - 24hr TSP measurement at AM1 (Reservoir) was suspended on 30/10/2016 due to equipment failure.  A make-up sample for AM1 was conducted on 2/11/2016.

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

06/10/2016

15:00-15:59

75

76

43

16:00-16:59

77

68

54

17:00-17:59

93

66

82

12/10/2016

15:00-15:59

33

32

29

16:00-16:59

25

29

26

17:00-17:59

24

29

28

18/10/2016

15:00-15:59

18

25

22

16:00-16:59

22

25

23

17:00-17:59

14

21

26

24/10/2016

15:00-15:59

13

13

8

16:00-16:59

14

15

29

17:00-17:59

13

14

12

30/10/2016

15:00-15:59

31

40

31(29/10)*

16:00-16:59

35

51

37(29/10)*

17:00-17:59

45

57

42(29/10)*

* - TSP monitoring at AM3 (Ash Lagoon) was suspended on 30/10/2016 due to suspension of power supply.  TSP sampling at AM3 was advanced to 29/10/2016.

 

                                                                        1-hr TSP               24-hr TSP

                                                                         (mg/m3)                   (mg/m3)

Action Level                                                      340                         190

Limit Level                                                        500                         260

 

Calibration:          Calibration details are shown in appendix F.

 

Equipment used:

Location

1-hr TSP

24-hr TSP

Reservoir and East Gate

TEOM

High Volume Air Sampler

Ash Lagoon

TEOM

TEOM

Tai Yuen Village

-

MINIVOL Portable Sampler