APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: December 2017

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

06/12/2017

61

67

61

56

28.2

70

73

12/12/2017

36 (14/12)*

85

78

82

36.3

70

70

18/12/2017

74

90

79

76

32.7

360

57

24/12/2017

108

121

116

167

22.8

360

60

30/12/2017

26

29

25

29

23.7

50

71

 

Note:

* -    TSP monitoring at AM2 (East Gate) was suspended on 12/12/2017 due to the breakdown of TEOM TSP Sampler. Make-up 24-hr TSP sampling at AM2 was conducted on 14/12/2017.

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

06/12/2017

15:00 - 15:59

70

67

76

16:00 - 16:59

70

73

70

17:00 - 17:59

70

72

63

12/12/2017

15:00 - 15:59

33 (14/12)*

106

109

16:00 - 16:59

41 (14/12)*

102

107

17:00 - 17:59

42 (14/12)*

95

107

18/12/2017

15:00 - 15:59

98

113

111

16:00 - 16:59

100

109

112

17:00 - 17:59

87

105

103

24/12/2017

15:00 - 15:59

103

136

115

16:00 - 16:59

104

119

113

17:00 - 17:59

87

107

96

30/12/2017

15:00 - 15:59

32

32

32

16:00 - 16:59

34

38

40

17:00 - 17:59

51

37

49

 

Note:

* -    TSP monitoring at AM2 (East Gate) was suspended on 12/12/2017 due to the breakdown of the TEOM TSP sampler. Make-up 1-hr TSP sampling at AM2 was conducted on 14/12/2017.

 

                                                                               

                                                                 1-hr TSP                      24-hr TSP

                                                                         (mg/m3)                   (mg/m3)

Action Level                                                      340                         190

Limit Level                                                        500                         260

 

Calibration:          Calibration details are shown in appendix F.

 

Equipment used:

 

Location

1-hr TSP

24-hr TSP

Reservoir, East Gate and Ash Lagoon

TEOM

TEOM

Tai Yuen Village

-

MINIVOL Portable Sampler