COVER

 

1.             Air quality, noise and Water Quality Monitoring in FEBRUARY 2018

 

This is the 137th monthly Environmental Monitoring and Audit (EM&A) report for the Project “Operation of Lamma Power Station Extension” prepared by the Environmental Team (ET). 

 

Unit L9 was not operated in the reporting month.  In this regard, no air quality, noise and water quality monitoring pertinent to Lamma Power Station Extension were carried out in the reporting month.

 

No complaint against the Project was received in the reporting month.  No prosecution was received for this Project in the reporting month. 

 

 

2.             Future Key Issues

 

2.1         Outage Plan for the coming 3 months

 

Unit

Period

Remark

L9

09/01/2018 to 19/03/2018

Unit Overhaul

 

2.2         Key issues for the coming month

 

Key issues to be considered in the coming month include:

 

Air Impact

 

·         To continuously monitor the stack NOx for Lamma Power Station Extension while Unit L9 is operating.

 

Noise Impact

 

·         To continuously monitor the noise for Lamma Power Station Extension while Unit L9 is operating.

 

Water Impact

 

·          To continuously carry out the water quality monitoring for Lamma Power Station Extension while Unit L9 is operating.

 

 

 

 

~ End ~