APPENDIX D  AIR QUALITY MONITORING RESULTS

 

Site: Lamma Power Station Extension

 

Month: December 2018

 

24 hour TSP Measurement:-

Date

TSP concentration (mg/m3)

Weather Information

(From Hong Kong Observatory)

Reservoir

 

(AM1)

East

Gate

(AM2)

Ash Lagoon

 

(AM3)

Tai Yuen Village

(AM4)

Mean Wind Speed

(km/hr)

Prevailing Wind Dir.

(°)

Mean R.H.

 

(%)

1/12/2018

55

29*(4/12)

51

69

27.7

060

78

7/12/2018

28

33

29

33

34.3

070

88

13/12/2018

51

50

48

42

27.8

360

68

19/12/2018

68

53

56

64

31.5

060

78

25/12/2018

33

31

31

26

25.8

060

81

31/12/2018

61

72

57

83

26.8

360

68

* -    TSP monitoring at AM2 (East Gate) was suspended on 01/12/2018 due to the maintenance of the TEOM. Make-up 24-hr TSP sampling at AM2 was conducted on 04/12/2018.

 

1 hour TSP Measurement:-

Date

Time

TSP concentration (mg/m3)

Reservoir

(AM1)

East Gate

(AM2)

Ash Lagoon

(AM3)

1/12/2018

15:00 - 15:59

27

16*(4/12)

45

16:00 - 16:59

38

17*(4/12)

49

17:00 - 17:59

50

17*(4/12)

49

7/12/2018

15:00 - 15:59

26

28

28

16:00 - 16:59

24

34

29

17:00 - 17:59

19

38

28

13/12/2018

15:00 - 15:59

74

117

76

16:00 - 16:59

87

120

82

17:00 - 17:59

74

99

80

19/12/2018

15:00 - 15:59

66

50

54

16:00 - 16:59

67

54

56

17:00 - 17:59

71

59

60

25/12/2018

15:00 - 15:59

43

39

37

16:00 - 16:59

45

42

39

17:00 - 17:59

46

41

40

31/12/2018

15:00 - 15:59

75

146

81

16:00 - 16:59

87

188

89

17:00 - 17:59

87

138

89

* -    TSP monitoring at AM2 (East Gate) was suspended on 01/12/2018 due to the maintenance of the TEOM. Make-up 24-hr TSP sampling at AM2 was conducted on 04/12/2018.

 

                                               

                                                                 1-hr TSP                      24-hr TSP

                                                                         (mg/m3)                   (mg/m3)

Action Level                                                      340                         190

Limit Level                                                        500                         260

 

Calibration:          Calibration details are shown in appendix F.

 

Equipment used:

 

Location

1-hr TSP

24-hr TSP

Reservoir, East Gate and Ash Lagoon

TEOM

TEOM

Tai Yuen Village

-

MINIVOL Portable Sampler