Lamma Power Station Extension - Baseline Monitoring Report (Construction Phase)

TABLE OF CONTENTS

PDF

EXECUTIVE SUMMARY

PDF

1

INTRODUCTION

PDF

2

AIR QUALITY

PDF

3

NOISE

PDF

4

WATER QUALITY

PDF

5

MARINE ECOLOGICAL SURVEY

PDF

6

CONCLUSION

PDF

LIST OF ANNEXES 

Annex A

Baseline Air Quality Monitoring Data

PDF

Annex B

Graphical Presentation of 1-hour and 24-hour TSP Results

PDF

Annex C

Baseline Noise Monitoring Data at Ash Lagoon

PDF

Annex D

Baseline Noise Monitoring Data at Pak Kok Tsui

PDF

Annex E

Baseline Noise Monitoring Data at Ching Lam

PDF

Annex F

Graphical Presentation of Baseline Noise Monitoring Data at Ash Lagoon

PDF

Annex G

Graphical Presentation of Baseline Noise Monitoring Data at Pak Kok Tsui

PDF

Annex H

Graphical Presentation of Baseline Noise Monitoring Data at Ching Lam

PDF

Annex I

Weather Condition During Baseline Noise Monitoring at Ash Lagoon and Pak Kok Tsui

PDF

Annex J

Baseline Marine Water Quality Monitoring Report prepared by Water Quality Monitoring Consultant

PDF

Annex K

Baseline Marine Ecological Monitoring Report prepared by Ecological Survey Consultant

PDF

Annex L

Additional Information of Baseline Marine Ecological Monitoring Report prepared by Ecological Survey Consultant

PDF

 

Supply and Installation of Submarine Gas Pipeline

Water Quality Monitoring During Post-Trenching Work - Baseline Monitoring Report PDF

 

Lamma Power Station Extension (Operational Phase)

Baseline Monitoring Report PDF